Hurricane Milton’s Impact on Solar Infrastructure: A Vulcan IW Analysis

A total of 74 solar plants (5,098.5 MW) were located in areas impacted by Hurricane Milton, a Category 3 storm that made landfall on the evening of October 9th, 2024. Each plant was assessed using satellite imagery both before and after the storm to identify potential damage.

Milton

Our findings indicate that only two facilities, Lake Placid Solar and FPL Cavendish Solar Energy Center, experienced visible damage due to the storm. This represents less than 3% of the total solar MW capacity within the impacted area. Notably, both instances of damage were attributed to direct impacts from tornadoes associated with the hurricane.

Despite the observed damage, both facilities continued to produce energy, demonstrating the resilience of solar power infrastructure. These findings challenge the perception of solar power's vulnerability to severe weather events.

Vulcan Infrastructure Watch remains committed to monitoring significant future events and providing valuable insights to our customers regarding the status and potential recovery of affected power assets.

 

 

Hurricane Milton Affected Solar Plants

Plant ID

Plant Name

MW Capacity

EIA Status

County

Damage Report

61653

Alafia Solar

60

(OP) Operating

Polk

No Visible Damage

62634

Babcock Preserve

74.5

(OP) Operating

Charlotte

No Visible Damage

59993

Babcock Solar Energy Center Hybrid

74.5

(OP) Operating

Charlotte

No Visible Damage

61654

Balm Solar

74.4

(OP) Operating

Hillsborough

No Visible Damage

61051

Barefoot Bay Solar Energy Center

74.5

(OP) Operating

Brevard

No Visible Damage

64641

Big Bend II Solar

45.8

(OP) Operating

Hillsborough

No Visible Damage

65912

Big Water

74.5

(V) Under construction, more than 50 percent complete

Okeechobee

No Visible Damage

61029

Blue Cypress Solar Energy Center

74.5

(OP) Operating

Indian River

No Visible Damage

61655

Bonnie Mine Solar

37.5

(OP) Operating

Polk

No Visible Damage

67203

Bullfrog Creek Solar

74.5

(V) Under construction, more than 50 percent complete

Hillsborough

No Visible Damage

65920

Buttonwood

74.5

(OP) Operating

St Lucie

No Visible Damage

62632

Cattle Ranch

74.5

(OP) Operating

DeSoto

No Visible Damage

63982

Charlie Creek Solar Power Plant

74.9

(OP) Operating

Hardee

No Visible Damage

61988

Citrus Ridge Solar

52

(OP) Operating

Orange

No Visible Damage

60061

Citrus Solar Energy Center Hybrid

74.5

(OP) Operating

DeSoto

No Visible Damage

62542

Debary Solar Power Plant

74.5

(OP) Operating

Volusia

No Visible Damage

56929

DeSoto Next Generation Solar Energy

25

(OP) Operating

DeSoto

No Visible Damage

63109

Discovery Solar Center

74.5

(OP) Operating

Brevard

No Visible Damage

66129

Dover Solar

25

(OP) Operating

Hillsborough

No Visible Damage

63978

Duette Solar Power Plant

74.5

(OP) Operating

Manatee

No Visible Damage

63495

Durrance

60

(OP) Operating

Polk

No Visible Damage

65041

Elder Branch

74.5

(OP) Operating

Manatee

No Visible Damage

66921

English Creek Solar

23

(V) Under construction, more than 50 percent complete

Hillsborough

No Visible Damage

64300

Fort Drum Energy Center

74.5

(OP) Operating

Okeechobee

No Visible Damage

64533

Fort Green Solar Power Plant

74.9

(OP) Operating

Hardee

No Visible Damage

65916

Fox Trail

74.5

(V) Under construction, more than 50 percent complete

Brevard

No Visible Damage

65438

FPL Cavendish Solar Energy Center

74.5

(OP) Operating

Okeechobee

Damage Visible

61656

Grange Hall Solar

61.1

(OP) Operating

Hillsborough

No Visible Damage

65918

Green Pasture

74.5

(V) Under construction, more than 50 percent complete

Charlotte

No Visible Damage

65042

Grove

74.5

(OP) Operating

Indian River

No Visible Damage

67208

Harmony Florida Solar II

74.5

(TS) Construction complete, but not yet in commercial operation

Osceola

No Visible Damage

63582

Harmony Solar

74.5

(OP) Operating

Osceola

No Visible Damage

65926

Hawthorne Creek

74.5

(OP) Operating

DeSoto

No Visible Damage

65915

Hog Bay

74.5

(V) Under construction, more than 50 percent complete

DeSoto

No Visible Damage

65921

Honeybell

74.5

(OP) Operating

Okeechobee

No Visible Damage

65877

Ibis

74.5

(OP) Operating

Brevard

No Visible Damage

61020

Indian River Solar Center

74.5

(OP) Operating

Indian River

No Visible Damage

61768

Interstate Solar Energy Center

74.5

(OP) Operating

St Lucie

No Visible Damage

64631

Jamison Solar (FL)

74.5

(OP) Operating

Polk

No Visible Damage

65683

Juniper Solar (FL)

70

(OP) Operating

Pasco

No Visible Damage

61657

Lake Hancock Solar

49.5

(OP) Operating

Polk

No Visible Damage

66128

Lake Mabel Solar

74.5

(OP) Operating

Polk

No Visible Damage

62541

Lake Placid Solar Power Plant

45

(OP) Operating

Highlands

Damage Visible

65684

Laurel Oaks Solar

61.2

(OP) Operating

Hillsborough

No Visible Damage

61663

Lithia Solar

74.5

(OP) Operating

Hillsborough

No Visible Damage

62750

Little Manatee River Solar

74.5

(OP) Operating

Hillsborough

No Visible Damage

65906

Long Creek

74.5

(U) Under construction, less than or equal to 50 percent complete

Manatee

No Visible Damage

64657

Magnolia Solar

74.5

(OP) Operating

Polk

No Visible Damage

60014

Manatee Solar Energy Center

74.5

(OP) Operating

Manatee

No Visible Damage

65905

Mare Branch

74.5

(U) Under construction, less than or equal to 50 percent complete

DeSoto

No Visible Damage

61664

Mountain View Solar (FL)

54.6

(OP) Operating

Pasco

No Visible Damage

65883

North Orange

74.5

(U) Under construction, less than or equal to 50 percent complete

St Lucie

No Visible Damage

65290

OE_FL10

74.9

(U) Under construction, less than or equal to 50 percent complete

Polk

No Visible Damage

62491

Okeechobee Solar

74.5

(OP) Operating

Okeechobee

No Visible Damage

62919

Orange Blossom Solar Center

74.5

(OP) Operating

Indian River

No Visible Damage

65925

Orchard

74.5

(OP) Operating

St Lucie

No Visible Damage

62921

Palm Bay Solar

74.5

(OP) Operating

Brevard

No Visible Damage

61665

Payne Creek Solar

70.3

(OP) Operating

Polk

No Visible Damage

61666

Peace Creek Solar

55.4

(OP) Operating

Polk

No Visible Damage

62924

Pelican Solar Center

74.5

(OP) Operating

St Lucie

No Visible Damage

61767

Pioneer Trail Solar Energy Center

74.5

(OP) Operating

Volusia

No Visible Damage

65868

Prairie Creek FL

74.5

(OP) Operating

DeSoto

No Visible Damage

65687

Riverside Solar

55.2

(OP) Operating

Hillsborough

No Visible Damage

62917

Rodeo Solar Center

74.5

(OP) Operating

DeSoto

No Visible Damage

65864

Sambucus

74.5

(OP) Operating

Manatee

No Visible Damage

62493

Southfork Solar

74.5

(OP) Operating

Manatee

No Visible Damage

65913

Speckled Perch

74.5

(V) Under construction, more than 50 percent complete

Okeechobee

No Visible Damage

67209

Storey Bend Solar

74.5

(TS) Construction complete, but not yet in commercial operation

Osceola

No Visible Damage

63583

Taylor Creek Solar

74.5

(OP) Operating

Orange

No Visible Damage

65863

Three Creeks

74.5

(OP) Operating

Manatee

No Visible Damage

65873

Turnpike

74.5

(OP) Operating

Indian River

No Visible Damage

61050

Wildflower Solar Energy Center

74.5

(OP) Operating

Desoto

No Visible Damage

64301

Willow Solar Energy Center

74.5

(OP) Operating

Manatee

No Visible Damage

61667

Wimauma Solar

74.8

(OP) Operating

Hillsborough

No Visible Damage

 

 

MiltonMap

 

This map illustrates the locations of Lake Placid Solar, FPL Cavendish Solar Energy Center, and Charlie Creek Solar Power in relation to the track of Hurricane Milton.

While Lake Placid Solar (approximately 45.5 miles from the storm center) and FPL Cavendish Solar Energy Center (approximately 49 miles from the center) sustained damage, Charlie Creek Solar (located only 16.5 miles from the center) remained unaffected.

This analysis highlights that proximity to the hurricane's eye did not directly correlate with damage. Both Lake Placid and FPL Cavendish experienced damage primarily due to tornadoes spawned by the hurricane, rather than from the hurricane winds themselves.

This observation underscores the importance of considering localized severe weather events, such as tornadoes, when assessing the potential impact of hurricanes on solar infrastructure.

MiltonTornados

This map depicts the tracks of tornadoes spawned by Hurricane Milton, categorized by strength. Hurricane Milton generated an unprecedented 46 tornadoes in Florida from October 8th to 9th, marking the state's most prolific tornado outbreak since 1954.

Utilizing these tornado tracks, we further investigated solar plants directly impacted by these severe weather events. In addition to Lake Placid Solar and FPL Cavendish Solar Energy Center, our analysis identified Ghost Orchid Solar as another facility directly impacted by an EF1 tornado.

(https://weather.com/storms/tornado/news/2024-10-23-hurricane-milton-florida-tornadoes-record)

Milton-LakePlacidSolarAndTornadoTrack

Lake Placid Solar and tornado track.

 

Milton-CavendishSolarEnergyCenter

FPL Cavendish Solar Energy Center and tornado track.

Milton-GhostOrchidSolarEnergyCenter

Ghost Orchid Solar Energy Center and tornado track.

 

62541 Lake Placid Solar Plant, Highlands County FL, 45 MW Solar, Operation Date: 12/2019, Damage Visible

10/5/2024 Pre-Storm                                                                        10/15/2024 Post-Storm

 

Milton-PreStorm.          Milton-PostStorm

 

1/12/2025 Latest

Milton-Latest

Damages at Lake Placid Solar.

Milton-Damages

(https://news.duke-energy.com/multimedia-gallery/photos/hurricane-milton/lake-placid-fla-solar-milton-damage#lg=g1&slide=1)

Though the damage continues to be seen in January 2025, Lake Placid solar continues to produce energy as seen in the EIA-923 data.

Milton-PowerData

65438 FPL Cavendish Solar Energy Center, Okeechobee County FL, 74.5 MW Solar, Operation Date: 1/2023, Damage Visible

10/5/2024 Pre-Storm                                                                        10/14/2024 Post-Storm

Milton-PreStorm2                                          Milton-PostStorm2

1/26/2025 Latest

Milton-Latest2Milton-PowerData2

 

65038 Ghost Orchid Solar Energy Center, Hendry County FL, 74.5 MW Solar, Operation Date: 1/2022, No Visible Damage

10/1/2024 Pre-Storm                                                           10/15/2024 Post-Storm

Milton-PreStorm3.                Milton-PostStorm3

1/25/2025 Latest

Milton-Latest3

63982 Charlie Creek Solar Power Plant, Hardee County FL, 74.9 MW Solar, Operation Date: 8/2022, No Visible Damage

10/5/2024 Pre-Storm                                     10/14/2024 Post-Storm

Milton-PreStorm4.                         Milton-PostStorm4

1/26/2025 Latest

Milton-Latest4