Since our last report we have not observed any TIL activity. We have however had PIs recheck all Haynesville wells as part of our ongoing effort to ensure data quality and have discovered that two wellpads which we previously believed had TILd were actually not producing. The two wellpads, both belonging to CHK will add a total of four wells to CHKs NYT inventory.
Wireline, or plug drill out jobs, occur after completion for the removal of underground frac stages. They are a part of bringing a well into production and can look a lot like a full flow back because removing the plugs does require some flow back and uses all the same equipment. The difference is in the duration. When we are unsure we will use on site inspections to verify activity.
Left to Right, wellpads 412674 and 3180 shortly after and during a wireline job respectively.
NYT Inventories